Blackdog Long Lead (5m) - Mini
20mm wide, (approx) 5 Meters long, Medium Snap Hook.
For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
20mm wide, (approx) 5 Meters long, Medium Snap Hook.
For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.